Heze 2025 Continuous Tyre Pyrolysis Project Record
Documented record of a 2025 Heze continuous tyre pyrolysis project with 50 t/day design capacity, delivery scope, site photographs and verification limits.
2025-07-02 Updated: 2026-08-28 9 min
Documented project evidence
Equipment line connected to this project record
This project record is linked to the applicable continuous tyre pyrolysis equipment page so buyers can compare the archive facts with current procurement requirements.
Heze, Shandong, China
Heze continuous tyre pyrolysis project
2025
Project year
2025
Documented design capacity
50 t/day
Documented delivery boundary
Design, equipment supply, installation support, on-site guidance, staff training and ongoing technical support.
Verification limit
The public record does not independently verify current output, uptime, product yield or emissions performance. Confirm project-specific values through feedstock tests, engineering documents and contract acceptance criteria.
Pyrojin's public record identifies a 2025 waste-tyre project in Heze, Shandong, using a continuous processing route with a documented design capacity of 50 t/day. This page separates those recorded facts from performance claims that require operating data.
The 50 t/day figure is a design capacity, not independently measured current throughput, annual output or guaranteed availability.
Project record at a glance
Project field
Recorded value
Location
Heze, Shandong, China
Project year
2025
Feedstock
Waste tyres
Operating route
Continuous
Documented design capacity
50 t/day
Evidence ownership
First-party Pyrojin record and site photographs
Delivery scope recorded by Pyrojin
The public project description records the following supplier scope. It should be read as a scope statement, not as third-party certification of the plant's present performance:
Project design and equipment supply.
Installation support and on-site technical guidance.
Staff training for the supplied system.
Ongoing technical support after delivery.
Installed configuration shown in site photographs
The three first-party photographs below document physical equipment at the reported site. The descriptions are limited to visible features and do not infer process results.
Photo HZ-01 - installed enclosed horizontal reactor line inside the workshop.Photo HZ-02 - closer view of the reactor end, connected pipework and vertical vessels.Photo HZ-03 - connected vertical vessel and pipework section.
What this record establishes-and what it does not
Question
Record status
Interpretation
Is an installed equipment line shown?
Documented
The first-party photographs show the physical configuration identified above.
Is 50 t/day the recorded design basis?
Documented
The public project description states a design capacity of 50 t/day.
Is current throughput independently measured?
Not established
No dated operating log, calibrated mass record or acceptance-test result is published here.
Are product yield and quality independently verified?
Not established
No closed mass balance or third-party laboratory report is published here.
Are emissions and permit compliance independently verified?
Not established
No permit, stack-test report or continuous monitoring record is published here.
Are uptime and commercial return independently verified?
Not established
No availability calculation, maintenance log, contract or audited financial result is published here.
Verification boundary
This is a first-party supplier project record, not an independent engineering audit. The photographs support the existence and visible arrangement of equipment; they do not by themselves prove feed rate, steady-state duration, yield, product specification, emissions performance, safety compliance or profitability.
Any buyer using this project as a reference should compare feed preparation, equipment configuration, battery limits, local control systems and acceptance criteria with the proposed project. Differences must be recorded before reference results are transferred into a design or financial model.
Evidence to request before using this project as a benchmark
A decision-grade comparison should add the following project-specific records:
Representative tyre-feed analyses, preparation route and acceptance window.
Process flow diagram, equipment list, battery limits and utility conditions.
Published 2 July 2025 and reviewed for evidence boundaries on 28 August 2026. Project facts and photographs are from Pyrojin's own public record. No customer identity, operating dataset, laboratory certificate, permit file or third-party audit was available in the public page reviewed; none is implied here.