What the public Malaysia case establishes — and what remains open
The year, capacity and equipment type below are reported in Pyrojin's public case record. They are not presented as independently certified operating results.
Reported project year
2015Stated on the public case page; no dated delivery or commissioning certificate is published.
Reported design basis
30 tonnes/dayStated capacity, not a verified daily throughput log or guaranteed output.
Reported equipment
Batch waste oil distillation plantThe public record does not include a signed equipment list or process and instrumentation diagram.
Public outcome
Delivery is reportedNo signed acceptance record, production log, product lab report or regulator record is public.
Equipment scope visible in the published record
The two project images support only the visible physical scope. Hidden interfaces and contractual boundaries require project documents.
- Batch distillation vessel and connected process piping
- Vertical separation or fractionation equipment visible in the project view
- Storage or settling tanks and site pipe interfaces
- Full utilities, emissions control, automation and commissioning scope remain document-dependent
Public evidence ledger
Project year, capacity and equipment type
Reported in the public case copy.
Two equipment photographs
Published with this case; the files contain no public geolocation or capture-date proof.
Commissioning and acceptance
A signed commissioning or acceptance record is not public.
Throughput, yield and product quality
No operating log, mass balance or laboratory report is public.
Published project photographs


Image boundary: these photos show equipment, but do not independently prove location, date, capacity, output quality or acceptance status.